Official name | Peñascal Wind Power Project |
---|---|
Coordinates | |
Turbine information | |
Turbines | 168 |
Manufacturer(s) | Mitsubishi |
Model(s) | MHI 92 |
Power generation information | |
Installed capacity | 404 MW |
The 404 megawatt (MW) Peñascal Wind Farm is located in Kenedy County, Texas and was completed in April 2010.[1]
The wind farm has 168 Mitsubishi MHI 92 wind turbines, each with a capacity of 2.4 MW. The facility created some 20 direct jobs in maintenance and operation of the wind farms. Around 200 people were involved in its construction. Iberdrola received a $114 million treasury grant for the project as part of the stimulus funds that was released in September 2009.[1] On July 30, 2010, the U.S. Treasury's 1603 Program website listed the Penascal II Wind Project as having received a total award amount of $222,861,149.00.
The wind farm includes an innovative radar system that detects the arrival of large flocks of migratory birds and shuts down the turbines if visibility conditions present a danger.[1]
|